廣告
xx
xx
回到網頁上方

New Taipei approves Banqiao Station entrance project

Reporter TVBS News Staff
Release time:2025/03/14 19:00
  • S

  • M

  • L

New MRT entrance to cut transfer time (Shutterstock) New Taipei approves Banqiao Station entrance project
New MRT entrance to cut transfer time (Shutterstock)

TAIPEI (TVBS News) — The New Taipei City Government approved the bid for the "Banqiao Station New Entrance Project" on Friday (March 14), which aims to improve the transfer system between the Circular Line Banqiao Station (環狀線板橋站) and other major rail lines. The new entrance, located at East Gate 1 of Banqiao Train Station (板橋火車站), will reduce transfer times from 12 minutes to just five.

Passengers currently face a complex transfer process between the Banqiao Station (板橋站) on the Bannan Line (板南線) and the Circular Line, which involves multiple routes and a 20-minute transfer fare integration. This upgrade will benefit around 30,000 passengers daily. New Taipei City Department of Rapid Transit Systems Director Lee Cheng-an (李政安) emphasized the importance of this project, highlighting the high daily passenger flow and the need to enhance service efficiency by adding a second entrance.

 

The new entrance will feature a three-story ground-level structure equipped with accessible facilities and is set for completion in 2027. Upon opening, passengers will be able to transfer from the Taiwan Railways' underground level to the first floor, proceed to the new entrance at East Gate 1, and reach the Circular Line platform using elevators, escalators, or stairs.

Taiwan Affairs

#Banqiao Station# New Taipei City# Circular Line# transfer system# East Gate 1# Taiwan Railways# rapid transit# Banqiao Station New Entrance Project# improve transfer times at Banqiao Station# accessible facilities at Banqiao Station

readmore

notification icon
感謝您訂閱TVBS,跟上最HOT話題,掌握新聞脈動!

0.0219

0.0202

0.0421